transmission line local labor impacts

I am assessing the impacts at the county level of constructing a large scale electric transmission line.  I have estimates of industry spending (sector 52), and the firm estimates that 90 % of the labor needed will come from outside the area due to its specialized nature.  Does IMPLAN take that into account in estimating impacts, or do I need to apply a local purchase percentage?