Powder Milk plant

Comments

1 comment

  • Avatar
    IMPLAN Support
    Hi Jason, Thank you for your post! From your post, it sounds as if you are working with the 440 sectoring scheme. It appears as if Sector 34 would be a good fit. However Sector 35 is also a viable option and will depend on whether you think the building will be more structurally like 34 (office and school buildings) or more like 35 (manufacturing open floor) I have attached the 440 Construction Excel Spreadsheet. [attachment=622]440ConstructionSectors.xls[/attachment]
    0
    Comment actions Permalink

Please sign in to leave a comment.